+27 011 608 3345

Case Study – Mining Industry – Inclined Plate Settler – Mineral and Solids Recovery

Mining Glencore

Mining Industry Case Study – Mineral and Mining Processing – Inclined Plate Settler – Mineral and Solids Recovery Problem Statement Due to increasing demand for resources, the footprint and efficiency of conventional type settlers make them undesirable. Our clients require a higher efficiency solids separation solution which can withstand the often abrasive and corrosive nature […]

Case Study – Mining Industry – Defoamer Project at Concentrate Thickener

Mining Industry Case Study – Defoamer Project at Concentrate Thickener Problem Statement The client was struggling with foam at the concentrate thickener. Solution Watericon trialed a project to find the optimal dosage of defoamer at different parameters for the tough adherent foam at the thickener. Due to the fine grind, the nature of the foaming […]

Job – HR Officer 2024

HR Officer Position Detail  Job Title HR Officer  Job Grade   Job Code   Department  HR Date Reviewed   19/05/2022 19/Location HO Employment Status Permanent  SUMMARY OF JOB PURPOSE An exciting opportunity has just opened up to join a fast-growing water treatment company that’s a leader in this multi-faceted industry. We’re looking for an exceptional HR […]

Case Study – Power Industry – Ultra Pure Water

Mining Glencore

Power Industry Case Study – Ultra Pure Water Problem Statement Eskom approached Watericon to supply equipment that will treat raw water at aspecific power station. Previous revision allowed for treatment of clarified waterbut after the site inspection, it was concluded that it would be extremely difficult to get clarified water, and easier to tie-in to […]

Case Study – Mining Industry – Mine Water Solutions – Water Balance

Mining Industry Case Study – Mine Water Solutions – Positive Water Balance Problem Statement A leading coal mine had a positive water balance. They were non-compliant with their water use license with an excess of 1.5MLD. The excess water was contained in pollution control dams over the mine. The excess water, which was high in […]

Case Study – Agricultural Industry – Royal Eswatini Sugar Corporation

Agricultural Industry Case Study – Distillery – Royal Eswatini Sugar Corporation Problem Statement RES approached Watericon to supply, deliver, install, supervise andcommission a water treatment plant to produce 30m3/h ofdemineralised water that will be fed to an electro-deionsation column(ED column) for dilution, and alcohol washing in the distillery. Solution The solution will include a reverse […]

City of Cape Town warns of water supply limitations caused by load shedding

City of Cape Town warns of water supply limitations caused by load shedding

The City of Cape Town has urged residents to use less water during prolonged stages of load shedding to prevent water supply limitations in higher-lying areas. The City issued the warning following the move to stage six load shedding, which impacts water supply operations in Cape Town, notably in higher-lying areas where water needs to […]

Job – HR Manager

HR Manager Position Detail    Job Title HR Manager  Job Grade   Job Code   Department  HR Date Reviewed   19/05/2022 Location HO Employment Status Permanent  SUMMARY OF JOB PURPOSE The HR Manager develops the necessary policies and procedures to ensure HR and IR compliance with all legal, statutory, and other functions within the company. The […]

Beneath the Surface – Launch Announcement

The innovations making waves in the future of water A new online film series is showcasing incredible innovations taking place across the world of water, highlighting game-changing technological advancements and ways communities are coming together to protect this precious resource. With themes shaped by the International Water Association (IWA) and the featured films produced on […]