Case Study – Containerised Shale Dam Reclaim Water Treatment Plants 36 m3/hr and 50 m3/hr
Cement Industry Containerised Shale Dam Reclaim Water Treatment Plants 36 m3/hr and 50 m3/hr Problem Statement Two containerized potable water treatment plants were required to treat river water from the existing Hilltop concrete raw water reservoir. The feed had a Turbidity of 400 NTU, it was required that the product water to be that of […]
Case Study – Condenser Cleaning – Waste to Energy System – Descaling
Cement Industry Condenser Cleaning – Waste to Energy System – Descaling Problem Statement A leading Cement manufacturer is making use of 2 water sources in their processes, Borehole and River. The challenge is high Hardness which causes scaling in heat exchange units such as condensers, coolers, cooling towers and boilers. Scaling reduces the work rate […]
Case Study – Pilot to Process Water Treatment Plant
Cement Industry Pilot to Process Water Treatment Plant Problem Statement This leading cement manufacturer in South Africa is making use of 2 water sources in its processes, Borehole and River. The challenge faced is high hardness levels in the source waters which causes scaling in heat exchange units such as condensers, coolers, cooling towers and […]
Case Study – Process Water Treatment Plant – 2.6MLD
Cement Industry Process Water Treatment Plant – 2.6MLD Problem Statement This leading cement manufacturer in South Africa is making use of 2 water sources in its processes, Borehole and River. The challenge faced is high hardness levels in the source waters which causes scaling in heat exchange units such as condensers, coolers, cooling towers and […]