Case Study – Mining Industry – Inclined Plate Settler – Mineral and Solids Recovery

Mining Glencore

Mining Industry Case Study – Mineral and Mining Processing – Inclined Plate Settler – Mineral and Solids Recovery Problem Statement Due to increasing demand for resources, the footprint and efficiency of conventional type settlers make them undesirable. Our clients require a higher efficiency solids separation solution which can withstand the often abrasive and corrosive nature […]

Case Study – Mining Industry – Defoamer Project at Concentrate Thickener

Mining Industry Case Study – Defoamer Project at Concentrate Thickener Problem Statement The client was struggling with foam at the concentrate thickener. Solution Watericon trialed a project to find the optimal dosage of defoamer at different parameters for the tough adherent foam at the thickener. Due to the fine grind, the nature of the foaming […]

Case Study – Power Industry – Ultra Pure Water

Mining Glencore

Power Industry Case Study – Ultra Pure Water Problem Statement Eskom approached Watericon to supply equipment that will treat raw water at aspecific power station. Previous revision allowed for treatment of clarified waterbut after the site inspection, it was concluded that it would be extremely difficult to get clarified water, and easier to tie-in to […]

Case Study – Reverse Osmosis Plant

Commercial Water Purification Systems by WaterIcon

Construction Industry Containerised RO Plant – CPV Solar Power Plant – Solar Panel Washing and Potable Supply – 450LPH Problem Statement Our client had an existing Reverse Osmosis Plant which wasn’t performing well. Upon inspection it was discovered that the 4” RO vessels were leaking. Solution Replace 4” RO vessels with Toray membrane range. Due […]